Should flooring or cabinets be installed first?
In new work, flooring usually goes down first so cabinets sit on top of a finished floor and the edge disappears under the toe-kick. If the cabinets are staying put, the new floor is worked around them instead. Check your own toe-kick before assuming which situation you are actually in.
The trade order, in short
When both are new, in a remodel or a build, flooring generally goes in before cabinets. The cabinets then sit on top of a finished floor, and the toe-kick, the recessed strip at the base, hides the edge where the two meet. When cabinets are staying and only the floor is changing, the order flips out of necessity: the new material has to be cut and worked around the cabinets already bolted in place, meeting them rather than running underneath.
Why it runs that direction
Continuous flooring under a cabinet run avoids a visible seam at every base, and it gives the installer a flat, known surface to set cabinets level on rather than working around a floor that has not been finished yet. Whether a kitchen floor runs under the cabinets or stops at them depends on whether the cabinets themselves are being changed at the same time, which is a decision that belongs to that room's page and gets settled at the measure rather than argued here.
The field test: check your own toe-kick
You can see which way your own kitchen, bathroom vanity or laundry cabinetry actually went without calling anyone. Open the dishwasher or pull back the toe-kick panel at the base of a cabinet run, the narrow recessed strip your toes fit under while standing at the counter, and look at what is underneath it. If the same flooring material continues under the cabinet base, the floor went in first. If the cabinet sits on bare subfloor, plywood, or a different material than the room around it, the cabinets went in first or the floor was only run up to their edge.
What the test tells you
It tells you how your existing room was actually built, which matters most if you are keeping the cabinets and only replacing the floor. A floor that already runs under the cabinets means the new material likely needs to do the same to avoid a visible line at the base. A floor that stops at the cabinet edge means the new material only needs to meet that edge cleanly, which is a smaller and usually simpler job.
What it does not tell you
It does not tell you whether the new material will clear the way the old one did. Finished height against cabinets, appliances and doorways is <a href="/rooms/kitchen/">the kitchen page's argument and the one to read on it</a>. What the test genuinely cannot show you is which kind of appliance you have. A unit that rolls out the front is in a different situation than one that has to lift out from under a counter, and the panel at the base of a cabinet run says nothing about either. Nor does the test say anything about condition: a floor that runs under the cabinets tells you the sequence somebody used, not whether the subfloor beneath it is sound, flat and dry, which is a separate check and a more important one.
Laundry rooms and mudroom cabinetry follow the same test
This is not a kitchen-only question. A laundry room with built-in cabinetry over the washer and dryer, or a mudroom bench with cubbies built into the wall, gets the same toe-kick or base check. Laundry cabinetry in particular is worth checking carefully, because a floor that runs under a built-in bank of cabinets in that room also has to account for the appliances sitting in front of it, and a washer or dryer is heavier and less forgiving to work around than most kitchen appliances. The same logic that applies at a kitchen toe-kick applies here: look at what is underneath before assuming which sequence your room already followed.
Where the actual height math gets settled
Bring what the toe-kick test shows you to the free in-home measure, along with which appliances are staying and which cabinets, if any, are being replaced. That is where the finished height of your new floor gets checked against every doorway, cabinet base and appliance clearance in the room, rather than assumed from what the old floor happened to do. Call 636-332-0654 with the rooms involved and we will walk through it in person.
More on flooring around cabinets
Vanities, floor-only projects, and what is realistic once cabinets are already in.
636-332-0654The same logic applies. A vanity that is staying put gets a floor worked around its base the same way a kitchen cabinet run does, and a vanity going in new usually sits on a finished floor. Check the toe-kick or the base of the vanity the same way you would in a kitchen, and bring what you find to the measure.
Then the floor is worked around what is already there rather than run underneath it, and the toe-kick test tells you exactly what edge the new material needs to meet. This is the more common situation for a floor-only project, and it usually means a more contained job than tearing out cabinetry to run flooring beneath it.
Rarely, at least not fully. Getting material under an installed cabinet run typically means removing the toe-kick and working in a tight gap, which is not the same job as flooring an open room before cabinets go in. In most kitchens where the cabinets are staying, the practical answer is meeting the cabinet edge cleanly rather than trying to run underneath it.