Answers ยท Hardwood

How long does hardwood installation take?

Longer than carpet, and the install itself is often not the longest part. A hardwood job starts when the material lands, includes an acclimation period before anyone fastens a board, and adds subfloor prep, the square footage, stairs and pattern work. A floor finished in the house then needs sanding, coating and cure time on top.

5.0 on Google from 131 reviews Wentzville, Missouri 636-332-0654
More on hardwood

The clock starts before install day

Most people time a wood job from the morning the crew arrives, and that is the part of it that gets underestimated. Two things have to happen first. The material has to physically be in the house, which is why an install date gets set once the order lands rather than when the quote is signed. Then the boards need time in the actual rooms to come into balance with your air, which is a step with its own page because it is the one people try to skip.

How long that window runs is not a fixed figure. It is set by the product's installation instructions and by the state of your house, and it is confirmed with a moisture meter rather than a calendar. On some jobs it is the single longest block in the whole schedule. Cutting it short does not save time, it moves the cost to a floor that keeps moving after it is down.

What the subfloor adds, and why it is hard to promise

Nobody knows exactly what is under an old floor until the old floor is off. The subfloor has to come up flat, dry and clean before wood goes over it, and each of those can turn into work. High spots get ground down and low spots get filled. Loose panels get refastened, which is also where a lot of squeaks get fixed for free. Old adhesive or staples have to come out. A subfloor that reads too wet stops the job until it does not.

That is exactly why the in-home measure looks at more than room dimensions, and why prep is written into the quote as a line item rather than discovered on install morning. If your house is going to need flattening, you would rather know at the measure than at eight in the morning on a Tuesday.

Size matters less than shape

Square footage is the number everybody reaches for first and it is the least interesting driver. An open, square, four hundred square foot room lays fast. The same footage broken into closets, a hall, two doorways and a bay goes far slower, because a plank floor is cut around obstacles one board at a time. Door jambs get undercut. Transitions get fitted at every threshold where the wood meets another material. Vents get framed.

  • Stairs are their own job. Treads, risers and a nosing at every tread edge are hand fitted work, and a staircase can take longer than a room several times its area. The stair conversation is on our stairs and hallways page.
  • Pattern work multiplies cuts. Herringbone, chevron, a diagonal layout, a border or an inlay all add cuts, layout time and waste compared to running straight.
  • Layout decisions cost time up front and save it later. Which direction the boards run and where the starting line falls get worked out so the last row is not a sliver, and running through a doorway into the next room changes that math again.
  • Quantity is worth knowing before any of it. The flooring calculator will get you a working square footage in a couple of minutes.

The install method sets the pace

Solid boards nailed or stapled to a wood subfloor go down at a steady rhythm once prep is finished, and the floor is walkable as soon as the last board is in. A glue down floor works to the adhesive's schedule instead of the crew's, with a working time and a cure time the maker sets, and traffic stays off it until that cure is done. A floating floor lays quickly but is only ever as fast as the subfloor preparation underneath it allows. Which method your job uses is decided by the product and by what is under the room, including whether there is a slab down there.

Prefinished or site finished is the biggest fork

This one can double a schedule, and it is chosen in the showroom long before install week. A prefinished floor arrives with its finish already cured onto the boards. When the last plank goes in, the floor is finished, cleaned and walkable, and there is no sanding stage at all.

A floor finished in the house is a second project stacked on the first. The boards go down raw. Then comes sanding in stages, an optional stain step that has to dry, and coats of finish with drying time between each one, followed by a longer cure before rugs go back down and furniture legs come back onto it. The finish manufacturer sets that schedule and it stretches or shortens with the temperature and humidity in the house while it is happening. What you buy for those extra days is a flat, continuous surface with no bevels and a color that can be matched to wood already in the home, which our hardwood page covers in full. It is a fair trade, it just has to be planned for rather than discovered.

Living around it, and getting a real range

A whole main level in one go is a different week from one bedroom at a time, and phasing is usually possible when being able to use the house matters more than being done. The room being worked in is not usable while it is being worked in, and site finishing adds dust, odor and a cure period where the floor has to stay clear. The state a room needs to be in beforehand, anything that has to be disconnected, and what becomes of the old floor are all agreed at scheduling rather than left to install morning, which our installation process page walks through step by step. Raise anything you are unsure about at the measure rather than assuming it either way.

Any page that hands you a day count for a floor nobody has seen is guessing, and we would rather not. A hardwood job runs longer than the same house in carpet for all the reasons above, and how much longer comes out of your rooms, your subfloor, your stairs and your finish choice. The measure is free, it happens in your house, and the range comes from what is found there. The date follows once your material is in. Call 636-332-0654 or come to 15570 Veterans Memorial Pkwy in Wentzville and tell us what you are thinking about.

Hardwood answers

More on the schedule of a wood job

How it compares to carpet, how much of it is waiting, and what it is like to live around.

636-332-0654

Because more of the job happens outside the hours the crew is laying floor. Carpet is delivered and installed. Wood has to come into balance with the house first, the subfloor has to be flat and dry rather than merely sound, every plank is cut around the obstacles in the room, and stairs and patterns are slow, careful work. If the floor is finished in the house, sanding and coating are a second project after that.

It varies enough that a general answer would mislead you. It depends on the product, on how far the material's moisture content is from your house when it arrives, and on the conditions in the rooms while it sits. The manufacturer's installation instructions set the requirement, and a meter reading on the wood and the subfloor confirms when it has been met rather than a date on a calendar.

In most cases, especially when the work is phased room by room, though the space being worked in is out of use while it happens. A floor finished on site is the harder one to live around, since sanding makes dust, coatings have an odor, and the floor needs to stay clear through its cure. Talk through how your house is laid out at the measure and we will tell you honestly what to expect.

Free estimate

Get a range for your rooms

Tell us the rooms, what is under them and whether you want prefinished or finished in place. The measure is free and the schedule comes out of what we find there.

Free estimate

636-332-0654

We reply the same business day. Prefer to talk now? Call 636-332-0654.

Call 636-332-0654